fish

Tilapia Pond Farming — 180-Day Cycle

A complete guide to managing earthen ponds for Nile tilapia production in Kenya. Covers pond preparation, fingerling stocking, feeding, water quality management, disease prevention, and marketing to deliver table-size fish in 180 days.

180 day program 0 active farmers
M

MkulimaHub Advisory Team

Curated by certified agronomists, veterinarians, and agricultural engineers across Kenya

10 years experience

These programmes are developed and reviewed by the MkulimaHub editorial team in collaboration with practising agronomists, veterinarians, and agricultural engineers across Kenya. Every activity is grounded in Kenyan growing conditions, locally available inputs, and real market realities.

Sample Schedule (First 2 Weeks)

Day 1

Pond Liming & Preparation

Apply agricultural lime at 100–200 kg/pond to raise pH to 7–8. Leave pond dry for 7 days. Apply chicken manure (200 kg/pond) or DAP (5 kg/pond) to stimulate phytoplankton.

Critical
Day 14

Fill Pond & Monitor Water Quality

Fill pond. Monitor pH (7–8), temperature (25–30 °C), transparency (Secchi disc 30–40 cm). Green water colour indicates healthy algal bloom.

Critical

Register free to see all 15 activities

+ 13 more activities across 180 days

KES 100

Full 180-day program

  • Daily activity guidance
  • SMS reminders
  • Expert Q&A access